
Many of the speakers expressed support for the option that would result in two lanes in each direction if the funding resources were in place.īecause the proposed project will primarily occur within the Caltrans right-of-way, the transportation agency will have the authority to agree with the authority’s final plan or reject it.

The authority proposed three alternatives: Widen the corridor by adding one mixed-flow lane in each direction between Euclid Street and the 605 Freeway, add two mixed-flow lanes in each direction between Euclid and the 605 or add one mixed-flow lane between Euclid and the 605 as well as a tolled Express Lane in each direction between State Route 73 and the 22 Freeway.Īn overflow crowd attended the hearing at the board’s headquarters.

The project calls for improvements along the 405 Freeway - between the 605 Freeway and the 55 Freeway in Costa Mesa - that will require the new lanes be added to improve traffic flow. “They could not afford the toll costs.”īoard members approved the one-lane expansion by an 11-4 vote. “They are on fixed incomes,” Levitt said. Levitt, one of two representatives of the city’s Leisure World section, said nearly 9,000 retirees would be negatively impacted. vehicle (SOV) express lanes, special use lanes, and truck lanes.
405 FREEWAY EXPRESS BUS LANE DRIVERS
Under the proposed toll lane plan, critics added, regular drivers could have faced up to $4,000 in new fees. The managed lane concept is currently being considered on major freeway projects in. This new system will determine the number of persons in a vehicle and compare it to the switch setting on the transponder, allowing Metro to charge the proper tolls for ExpressLanes trips.

ORANGE > Orange County Transportation Authority board members approved the expansion of the 405 Freeway by one lane in both directions from Seal Beach to Costa Mesa, but a controversial plan to add toll lanes along the 405 Freeway was dropped after strong opposition from mayors along the freeway corridor. Metro ExpressLanes will begin testing the system along the I-10 and I-110 ExpressLanes starting June 1, 2020.
